Development

Image

Development Works in the 1st ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing Waking track at 1st Ward Vyshnavi Nagar Layout

3.20

Completed

GF

Reading Room Repairs at Bhavanagar colony 1st ward

1.00

Completed

GF

Construction of CC Road Approach at Bhavanagar Colony (Fire Station Road)

0.98

Completed

GF

Construction of C.C. Culvert at Bhavanagar (Beside Municipal Office) 1st ward

0.72

Completed

GF

Providing 110 Chain Mounted Proclainer Auto Nagar at 1st Ward in Ponnur Municipality

0.44

Completed

14th finance

Providing C.C. road from vidya Sagar House to Bank Sambasiva Rao house beside Municipal office in 1st ward

5.08

Completed

14th finance

Construction of CC Drain & a Culvert from T Sambasiva  Rao House to M. RamPrabhu House at 1st ward in Ponnur Municipality

4.52

Completed

14th finance

Construction of CC Drain & a Culvert from Chinnamallu Venkateswarao House to Sivakumar Swamy House at 1st ward in Ponnur Municipality

2.44

Completed

14th finance

Construction of CC Drain from Modhugula Venu Gopal House to tandra Nagarjuna House at 1st ward in Ponnur Municipality

2.07

Completed

14th finance

Construction of CC Drain & a Culvert from T Sambasiva  rao House to R RamPrabhu House at 1st ward in Ponnur Municipality

5.08

Completed

Non-PG

Providing C.C. Road beside Municipal office in 1st ward

5.50

Completed

SDF

Providing C.C. road from vidya Sagar House to Bank Sambasiva Rao house beside Municipal office in 1st ward

3.50

Completed

SDF

Providing New Shed at Lorry Nagar Vyshnavi Nagar Layout at 1st Ward in Ponnur Municipality

5.00

Completed

SDF

Providing CC raod  from Vushnavi Nagar 1st lane   at 1st  ward in  Ponnur Municipality

1.50

Completed

MP Lads

Providing Internal Road in Municipal Lorry Stand in Ponnur Municipality

5.00

Completed

MP Lads

Providing Internal Road in Municipal Lorry Stand in Ponnur Municipality

5.00

Completed

MP Lads

Providing Internal Road in Municipal Lorry Stand in Ponnur Municipality

5.00

Work is in progress

MP Lads

Providing Internal Road in Municipal Lorry Stand in Ponnur Municipality

5.00

Work is in progress

SFC

Providing W B M Road from Vattikuti vari Apartment to Vani type Institute Reddygari House at 2nd cross road Vyshnavi Nagar.

3.98

Completed

SFC

Providing CC drain from Ankinidu Prasad House to fire Station at 1st ward

18.45

Completed

SFC

Construction of CC Drain & a Culvert from Dokku Srinivasa Siva Ram Prasad House to (Dr.No.1-1-1/41) to Reddy House (Dr.No.1-5-28) at 1st ward in Ponnur Municipality.

7.64

Work Order issued, Agreement to be concluded

SFC

Construction of CC Drain &  Culverts from Dedduluri Lakshmi House (Dr.No.1-1-16) to Bhavi Reddy nageswara Rao House (D.No.1-5-22) at 1st ward in Ponnur Municipality.

7.64

Work Order issued, Agreement to be concluded

Total Estimation Cost

98.74

 
Image

Development Works in the 2nd ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing C.C.Road from Tanikonda Durga Rao House to Mandal Office Road Church in 2nd Ward.

3.13

Completed

14th Finance

Providing C.C.Road at Bommisetty koteswara Rao Bazar 2nd cross road at 2nd ward

5.75

Completed

14th Finance

Construction of CC Drains on both sides & a Culvert at Nagisetty Koteswaralu House to Chaganti Venkateswarlu House at 2nd ward in Ponnur Municipality

3.31

Completed

14th Finance

Providing C.C.Road at Tractor Purnaiah house to pallikala Hari Babu House at 2nd ward in Ponnur Munucipality

3.30

Completed

14th Finance

Providing C.C.Drain at Bommisetty Koteswara Rao Bazar 2nd cross road at 2nd ward in Ponnur Munucipality

3.00

Completed

SDF

Providing Key walls and dust at Vyshnavi Nagar ELSR Road in 2nd ward

2.50

Completed

SDF

Providing CC raod and Drain from Palikala Hari babu House to Kunapareddy Suri Babu House at 2ndward in  Ponnur Municipality

1.50

Completed

SFC

Providing CC road  at Vyshnavi nagar Water tank road 2nd ward

14.64

Completed

SFC

Construction of CC Drain Akula Prabhakar House to Chakradhar House at 2nd ward in Ponnur Municipality.

0.95

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Konnapu Reddy Babu House to Pallikala Hari Babu House at 2nd ward in Ponnur Municipality.

0.95

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Opp VSR Hall to Sri Ranga Puram Channel at 2nd ward in Ponnur Municipality.

4.37

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Pavana Bavaiah House to Main Road  at 2nd ward in Ponnur Municipality.

5.33

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Opp Main Road to R&B (MDO Office Road) at 2nd ward in Ponnur Municipality.

1.74

Work order issued, Agreement to be concluded

Total Estimation Cost

50.47

 
Image

Development Works in the 3rd ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

13th Finance

Construction  of C.C. Drain at Bhavanarayanapet

10.65

Completed

GF

Providing Cuddapa Slab in Settey Kotaiah School  at 3rd ward

1.00

Completed

GF

Providing Cuddapa Slab in Yerukulawada School  at 3rd ward in Ponnur Municipality

1.51

Completed

GF

Providing existing drain wall raising beside MRO Office at 3rd ward

2.70

Completed

GF

Providing Earth Fiiling in Hindu Burial Ground at 3rd Ward in Ponnur Municipality

2.00

Completed

Non-PG

Providing C.C Drain C.C. Approaches at Various places  at 3rd ward in Ponnur Municipality

2.00

Completed

14th Finance

Consruction of C.c.Drain on both sides and culvert from Katta samuel house to Devarakonda Ramaiah house at 3rd ward

2.29

Completed

14th Finance

Providing C.C. Road from Uma Maheswara Rao (H) to Club Road at 3rd  Ward in Ponnur Municipality

2.00

Completed

14th Finance

Providing C.C. Road at Bhavanagar Pet 2nd line from Sambasiva Rao (H) to End of the Road at 3rd  Ward in Ponnur Municipality

12.75

Work is in Progress

SDF

Providing C.C.Road from Adapa Srinivasa Rao House at Siddhi Vinayaka Nagar in 3rd ward

2.00

Completed

SDF

Providing CC raod  from Yerukulawada Road to School Inside Building  ward in  Ponnur Municipality

1.50

Work to be Started

MPLADS

Improvement of 3rd ward Hindu Burial Ground

5.00

Completed

MPLADS

Construction of Community Hall in 3rd ward in Ponnur Municipality

3.00

Work to be Started

SFC

Providing CC Drain at Siddi Vinayaka Nagar Main road 3rd ward in  Ponnur Municipality

5.93

Work to be started

SFC

Providing CC raod  from ASM Collecge to Tashildar Office at 3rd ward in  Ponnur Municipality

10.01

Work order issued, Agreement to be concluded

SFC

Providing Keywalls and dust from Siddi Vinayaka Nagar Kalva Katta (Sri Ranga Puram Channel) to DVC Colony Culvert at 3rd   Ward in Ponnur Municipality

4.98

Work order issued, Agreement to be concluded

Total Estimation Cost

69.32

 

Image

Development Works in the 4th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing C.C Road from Alapati Subramanyam House to Abdul Ravoof House

6.63

Completed

GF

Construction of NTR Anna canteen of Vegetable Market

3.45

Completed

GF

Construction of C.C.Culvert at Anna Canteen

1.20

Completed

14th Finance

Providing C.C.Road and Culvert from R.V.Narasimha rao house to Chemakurthi Subba Rao at 4th ward in Ponnur Municipality

6.00

Work is in progress

SDF

Providing CC raod  from Shadi Khana Opp road  4th  ward in  Ponnur Municipality

1.50

Work to be started

SFC

Providing CC road Molla vari street Old Ganni Merchante to Mayuri Johny (H) at 4th ward

4.76

Work to be started

SFC

Providing CC raod  from Bellam kottu Bazar  at 4th ward in  Ponnur Municipality

3.12

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from GBC Road to Metro Tailer Jhani House at 4th ward in  Ponnur Municipality

1.81

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from Gani Merchant to GBC Road and Shadikhana Opp road at 4th ward in  Ponnur Municipality

1.84

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Old Gani Bags bazar GBC road to Mayuri Abdulla House at 4th ward  in Ponnur Municipality.

2.57

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Metro Jhani House to RTC Driver Jalill House at 4th ward  in Ponnur Municipality.

2.08

Work order issued, Agreement to be concluded

Total Estimation Cost

34.96

 
Image

Development Works in the 5th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

13th finance

Construction of C.C.Drains at Duffpet

27.47

Completed

Non-PG

Ponnur Municipality - Providing C.C.Road from ASM College gate to NMSchool road at 5th ward under  Non plan grant

3.12

Completed

GF

Providing C.C.Road road widening  beside MRO Office at 5th ward

2.90

Completed

GF

Providing C.C.Roads from Baji House to culvert at 1st lane Duffpet - 5th ward

6.50

Completed

GF

Construction of Anna Canteen Compound Wall at 6thWard in Ponnur Municipality

6.00

Work is in Progress

14th finance

Providing C.C.Drain from Shaik Khudus house to Shaik Kasim house in 1st lane Dufpet 5th ward in Ponnur Munucipality

4.25

Completed

14th finance

Providing C.C. Road from Sk Gouse  (H) to Julfikar Ali Beig 5th  Ward in Ponnur Municipality

8.80

Completed

SDF

Construction of C.C.Road from C.C.Culvert to North side Compound wall at Duffpet in 5th ward

1.65

Completed

SDF

Providing CC raod  from Abdul Shukur House to C.C.Road Last  5th  ward in  Ponnur Municipality

1.50

Work to be Started

SFC

Providing CC road from Sk Asha Bee (H) to Patan Ali Khan at 5th ward

8.15

Work to be started

SFC

Providing CC raod  from Existing culvert to ASM Collecge  at 5th ward in  Ponnur Municipality

4.40

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Duff Pet Culvert at 4th lane to South side Culvert at 5th ward  in Ponnur Municipality.

0.98

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from  Advacate Ajeez House to Sridevi Studio at 5th ward  in Ponnur Municipality.

1.79

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from  Muneer Tent House to Raja Studio and Culvert at Opp S S Hak Hospital at 5th ward  in Ponnur Municipality.

2.16

Work order issued, Agreement to be concluded

Total Estimation Cost

79.67

 
Image

Development Works in the 6th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing C.C.Road to Beside of Gondi Rambrahmam Park at 6th Ward

2.71

Completed

GF

Providing C.C Drain from Anjanaya Naidu House to Dr. Prasad Rao Grai House via Kancharla Baskarao House at 6th ward

3.22

Completed

GF

Repairs of Syphon Well at 6th ward in Ponnur Municipality

1.00

Completed

GF

Constructiono of NTR Sujala Water Shed at Railway Station Road

1.68

Completed

CDP

Providing CC Road from Lab Venkateswara Rao Houseto Mandava Bhaskara House at 6th ward, Vidya Nagar

3.25

Completed

14th Finance

Providing C.C. Road from Srirangapuram Channel to Muneswara Rao House at 6th ward in Ponnur Municipality

3.45

Completed

14th Finance

Providing C.C. Road from Venkateswara Rao House to Muneswara Rao House at 6th ward in Ponnur Municipality

4.35

Completed

SDF

Providing C.C.Road from Yalavarthi Sivanantham house to Sri Ranga Puram Channel in 6th ward

3.00

Completed

SDF

Providing CC raod  from Dileep House to Savitri House  6th  ward in  Ponnur Municipalityth ward  in  Ponnur Municipality

1.50

Completed

MPLADS

Providing C.C Road from Mandava Baskara Rao (H) to end of Eastern side at 6th ward Vidya Nagar

4.00

Completed

MPLADS

Providing of  C C Raod  from Dileep House to Savithri House at 6th  ward in  Ponnur Municipality

2.00

Completed

SFC

Prviding C.C Road from Ponnaganti Gopala Rao(H) to Ramana (H) at6th ward

4.92

Completed

SFC

Providing CC raod from Lakshmi Theater Road at 6th ward

17.52

Work is in progress

SFC

Providing CC raod  from Meda Sri Ramulu House to Devadu Subba Rao House and Peddi Anjaiah House to S.Anjaneyulu Naidu house  at 6th ward in  Ponnur Municipality

10.29

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from K Veeraiah House to Lakshmi Theater Road at 6th ward in Ponnur Municipality.

2.95

Work order issued, Agreement to be concluded

Total Estimation Cost

65.84

 
Image

Development Works in the 7th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing C.C Road from Existing C.C Road to end Aluru Road (Railway gate Road) at7th ward

5.34

Completed

Non-PG

Construction of R.C.C Culvert on Sriranga puram chanel at Kanthamma House

1.25

Completed

Non-PG

Ponnur Municipality -  Providing Gravel Road at 7th Ward Kalava katta road under  Non plan grant

3.00

Work to be started

14th Fiance

Erection of Iron Chain link mesh at 7th ward Municipal Building

5.60

Completed

SFC

Construction of CC Drains from Church to Boddu Koteswara Rao (H) at 7thward DVC Colony

1.50

Completed

SFC

Construction of R.C.C Culvert at Sriranga puram chanel towdards D.V.C Colony

8.68

Completed

SDF

Providing Gravel & Dust from DVC Colony, Yedukalawada Culvert to Along with Srirangapuram Channel Bund upto Station Road at 7th Ward (SC Area)

5.00

Completed

SDF

Providing CC raod  from Existing C.C.road to School Building 7th  ward in  Ponnur Municipality

1.50

Work to be Started

SDF

Providing C.C.Road Approaches at DVC Colony Culvert in 7th ward

3.00

Completed

GF

Leveling of Soil besides DVC Colony Main Road at 7th Ward in Ponnur Municipality

2.00

Completed

GF

Providing Keywalls and dust from 1st cross road at DVC Colony 7th  Ward in Ponnur Municipality

2.00

Completed

GF

Providing C.C. approaches at Culvert 7th ward

3.66

Completed

GF

Providing C.C. approaches in various places 7th ward

0.75

Completed

SCSP

Construction of CC Road at DVC Colony 7th ward

9.20

Completed

SCSP

Construction of CC Drains at DVC Colony 7th ward

29.30

Completed

SCSP

Providing C.C. Road from Culvert to DVC Main road  7th  Ward

17.00

Completed

SCSP

Providing side burms Railway station road to Pipe culvert at7th ward in Ponnur Municipality

3.20

Completed

SCSP

Protection of Sri Ranga Puram Channel in Ponnur Municipality- Package-I

49.99

Completed

SCSP

Protection of Sri Ranga Puram Channel in Ponnur Municipality- Package-II

49.90

Completed

SCSP

Protection of Sri Ranga Puram Channel in Ponnur Municipality- Package-III

49.90

Completed

SCSP

Protection of Sri Ranga Puram Channel  in Ponnur Municipality - Package-IV

49.99

Completed

SCSP

Protection of Sri Ranga Puram Channel in Ponnur Municipality - Package -V

49.98

Completed

SCSP

Construction of CC Drains at DVC Colony 7th ward

9.52

Work order issued, Agreement to be concluded

SCSP

Providing CC Arch at  DVC Culvert   7th ward

2.24

Work order issued, Agreement to be concluded

SCSP

Providing Key walls and dust from DVC Culvert to Ramulamma (H)  and C.C.Culvert at7th ward

13.95

Work order issued, Agreement to be concluded

SCSP

Providing CC road from DVC Colony Culvert to Saibaba Temple at Railway Station road 7th ward

38.50

Work order issued, Agreement to be concluded

SCSP

Laying of A.C. Cl15 pipes from Saibaba Mandir to DVC Colony Culvert in 7th  Ward in Ponnur Municipality

11.37

Work order issued, Agreement to be concluded

Total Estimation Cost

427.32

 
Image

Development Works in the 8th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Repairs to school buildings at 8th ward in Ponnur Municipality

1.37

Completed

GF

Providing 110 Mounted Proclainer at Cabin Pet to Kondamudi Road in Ponnur Municipality

0.22

Completed

SDF

Providing CC raod  from Vinukonda Veera Brahamam House to Kolasani Anjali House 8th  ward in  Ponnur Municipality

1.50

Completed

MPLads

Providing of  C C Road and C C Drain from Vinukonda Brahamam House to Kolasani Anjali House at 8th ward in  Ponnur Municipality

2.00

Completed

SFC

Providing CC drain from Perugu Subba Rao House to Alluru Gate at 8th ward

8.58

Completed

SFC

Construction of CC Drain from SK Mabu Shaheb House to Chikati Benjimen House at 8th ward  in Ponnur Municipality.

1.30

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Salagala Syam Prasad House to SK  Moulali House  at 8th ward  in Ponnur Municipality.

1.79

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Perugu Narasimha rao House to Perugu Sambasiva Rao House at 8th ward  in Ponnur Municipality.

1.03

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Nattala Josheph Jhon House to Main road at 8th ward  in Ponnur Municipality.

1.27

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Vinukonda Rama Brahma chary House to Kolasani Anjali House at 8th ward in  Ponnur Municipality

3.55

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Aramandla Suvarchala House to Ponaganti Subba Rao House  at 8th ward  in Ponnur Municipality.

0.75

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Suresh House to Nanpaneni Madhukar House  at 8th ward in  Ponnur Municipality

5.35

Work order issued, Agreement to be concluded

SFC

Providing Key walls and Dust fromExisting C C Road to Krishna Mandiram at 8th Ward in Ponnur Municipality

2.74

Work order issued, Agreement to be concluded

SFC

Providing Key Walls and Dust from k Prem Kumar House to P Rama Krishna House at 8th Ward In Ponnur Municipality

0.99

Work order issued, Agreement to be concluded

SFC

Providing Key Walls and Dust from D Srinivas Babu House to D Seshagiri House at 8th Ward In Ponnur Municipality

0.60

Work order issued, Agreement to be concluded

Total Estimation Cost

33.04

 
Image

Development Works in the 9th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

MPLADS

Providing C.C Road from Chittineni Sankara Rao House to Chittineni Bala Sankara Rao (H) in 9th ward

1.90

Completed

MPLADS

Providing C.C Road from Chittineni Ramaiah House to Chittineni Sankara Rao (H) in 9th ward

1.90

Completed

MPLADS

Providing of  C C Raod  from Dasari Jayamma House to Katuri Brahamam House at 9th  ward in  Ponnur Municipality

2.00

Work is in Progress

MPLADS

Construction of Community Hall near Ramamandiram at Railpet in Ponnur Municipality

2.50

nearing completion

Non-Plan

Providing CC road from existing CC road to Ancha Prasad Dall Mill at 9th Ward

9.45

Completed

Non-Plan

Providing CC road from Thava Pulla Rao(H) at Adi Kumar School at 9th Ward.

14.00

Completed

Non-Plan

Ponnur Municipality -  Providing C.C.Road & Drain from Weavers Society Building to Reddy Boina Satyam House at 9th ward under  Non plan grant

3.00

Completed

GF

Repairs to Adi Kumari Elementary School at 9th ward

0.58

Completed

GF

Providing C.C. Road & C.C.Drain from Yenumala Ravi House to Bolagani Venkaiah house 9th ward

4.50

Completed

14th finance

Providing C.C. Road from Bejawada Nageswara Rao House to Dasari Venkateswara Rao House at 9th ward in Ponnur Municipality

2.39

Completed

14th finance

Providing C.C.Drain from  from Gorantla Nagendramma Garu (H)  to katuri kotaiah garu (H)  house in 9th ward in Ponnur Munucipality

3.53

Completed

14th finance

Construction of CC Drains & Culvert from Dasari Nageswara Rao house to Chintakrindha Subbarao house  at 9th ward in Ponnur Municipality

5.97

Completed

14th finance

Providing C.C.Road from  from Gorantla Nagendramma Garu (H)  to Dkaturi kotaiah garu (H)  house in 9th ward in Ponnur Munucipality

7.92

Completed

SDF

Providing CC raod  from Yughandhar House to Kaja Venkata Krishna Prasad House at 9th  ward in  Ponnur Municipality

1.50

Work is in Progress

SFC

Providing CC raod and Drain from Eepuri Prasad House to Katuri Bala Sanka rao House   at 9th ward in  Ponnur Municipality

4.46

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Kaja Venkata Krishna Prasad House to Chintakrinda Yugandhar House  at 9th ward in  Ponnur Municipality

4.18

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Chinta Krinda Janaki Ramaiah House to Thota Venkateswara Rao House   at 9th ward in  Ponnur Municipality

2.41

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Ancha Ramaiah Mill back side   at 9th ward in  Ponnur Municipality

4.60

Work order issued, Agreement to be concluded

Total Estimation Cost

76.79

 
Image

Development Works in the 10th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing Compound Wall  and Archto 10th & 11th ward Hindu Burial Ground

8.05

Completed

Non Plan

Ponnur Municipality - Providing C.C.Road from Katragadda Ramana (H) to Gogineni Sivarama Krishnaiah (H) at 10th ward  under  Non plan grant

4.89

Completed

Non Plan

Fromation of Walking track and Fixing of Iron Chain link mesh for protection of Peddanan Tank at 10th  ward in Ponnur Municipality.(under Non Plan Grant)

9.90

Work is in Progress

SDF

Providing C.C.Road from Palakendram to Krishna shop in 9th and 10th ward

4.38

Work to be started

14th Finance

Providing C.C.Drain Kalpana Building to Nagula Cheruvu at 10th  Ward in Ponnur Municipality

18.22

Work is in Progress

14th Finance

Providing C.C.Road from K.Koteswara Rao house to old C.C.Road at 10th Ward in Ponnur Municipality

7.48

Work is in Progress

SDF

Providing CC raod  from Opp AP Public School 10th  ward in  Ponnur Municipality

1.50

Work to be Started

MPLADS

Providing Compound Wall to 10th & 11th ward Hindu Burial Ground

5.00

Completed

MPLADS

Providing of  C C Raod  from Opp AP Public School at 10th  ward in  Ponnur Municipality

2.00

Work to be Started

SFC

Providing CC raod from Nagula Chruvu to Peddana Cheruvu at 9th & 10th ward

25.78

Completed

SFC

Providing CC raod and Drain from  Nannapaneni Sivarama Krishnaya House to Yemeneni Dinadayal house at 10th ward in  Ponnur Municipality

6.30

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from  Borra Venkateswarlu House to (Vastu Siddanti) to South side Church at 10th ward in  Ponnur Municipality

4.48

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Jampani vari street to Nagula Cheruvu Via AP Public School at 10th ward in  Ponnur Municipality

12.02

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Ramineni Seshaya Master (NCC Master) House to Jampani vari Bazar Nangineni Srinivasa Rao House at 10th ward in Ponnur Municipality.

2.37

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Kandepu Sudhakar House to Battina Srinivasa Rao Gowdown at 10th ward in Ponnur Municipality.

7.07

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Katragadda Srinivasa Rao House to Nannapaneni Pandu Ranga Rao Houseat 10th ward in Ponnur Municipality.

6.68

Work order issued, Agreement to be concluded

Total Estimation Cost

126.12

 
Image

Development Works in the 11th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Construction of  CRC Building in 10th & 11th wards

23.50

Completed

GF

Construction of Compound wall at CRC Building in 10th & 11th wards

14.50

Completed

GF

Providing C.C Road from Uppalapati Hemalatha(H) to Vennam Vijaya Sekhar(H)

3.96

Completed

GF

Providing C.C Road from Govada chowdai(H) to chruch at 11th ward

1.56

Completed

GF

Ponnur Municipality - Providing C.C.Culvert at Kalpana Building (Repalle Road) - 11th ward

1.00

Completed

SDF

Providing CC Road from M.Madhu (H) to P.Prameela(H) at 11th ward

1.50

Completed

SDF

Providing C.C Road Inturu Venkateswara Rao (H) to S.Pasad (H) at 11th ward

2.50

Completed

SDF

Providing CC Road from Lella Veraiah (H) to Savitramma(H) at11th ward

8.90

Completed

SDF

Ponnur Municipality - Providing C.C.Road from Gowada Surya Prakash house to N Radha Krishna House - 11th ward  under SDF

2.60

Completed

SDF

Providing C.C.Road from Near Sukavasi Nageswara Rao Chavidi at 11th ward ward in Ponnur Municipality

1.50

Completed

Non Plan

Ponnur Municipality - Providing C.C.Road from Patnalayam to Hotel Venkateswarlu House at 11th ward

10.09

Completed

Non-Plan

Providing WBM Road from Doppalapudi Sambasiva Rao House to K. Siva Kumari House

2.13

Completed

Non-Plan

Ponnur Municipality -  Providing Key walls and dust at Pragada Kotaiah Nagar 11th ward (Nagendra Swamy temple) under  Non plan grant

4.05

Completed

Non-Plan

Ponnur Municipality - Providing C.C.Road from Govada Vennkatapaiah House to Kalpana Building (Repalle Road) - 11th ward  under  Non plan grant

13.87

Completed

13th Finace

Ponnur Municipality - Providing Distribution system at karanam gari road Nidubrolu area

9.99

Completed

14th finance

Ponnur Municipality - Providing C.C.drain from B.Sivaiah House to Oruganti Satyam House - 11th ward  under 14th Finance

5.30

Completed

14th finance

Providing C.C. Road B Sivaiah House to Origanti Satyam House11th  Ward in Ponnur Municipality

9.90

Completed

MP Lads

Providing of  C C Raod  (Cabin peta Main road to R.Srinivasra rao House) at 11th ward in  Ponnur Municipality

2.00

Completed

SFC

Providing CC raod from Kandepu Venkateswara Rao (H) to Karanam gari Bazr,  and Origanti Butchaiah gari (H) to Garikapati Subba Rao House at 11th ward

9.31

Work to be started

SFC

Providing CC  Drain from M China Papaiah House to Kondamudi road (Karanam Gari Road)   at 11th ward in  Ponnur Municipality

6.64

Work order issued, Agreement to be concluded

SFC

Providing  C C Road Opp Sudhakar Shop at Ward No.11 in Ponnur Municipality

7.50

Work order issued, Agreement to be concluded

Total Estimation Cost

142.30

 
Image

Development Works in the 12th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

SFC

Construction of CC Drains from Jaibharath Reading Room to Market Yard at 12th ward Yerakalawada

11.35

Completed

GF

Raising of Compound wall  in Municipal High School  in 12th ward

1.24

Completed

SDF

Providing CC Road from M Devasahayam house to A Yesaiah house

3.60

Completed

SDF

Providing Internal Road at Jyabharat Nagar community Hall in Ponnur Municipality

1.50

Completed

MP Lads

Construction of Community Hall at 12th Ward in Ponnur Municipality

2.50

Completed

SCSP

Construction of C.C.Drain from G Nageswara rao house to Repalle road -  Jayabrat Reddy nargar 12th ward

10.00

Completed

SCSP

Construction of C.C.Drain from Puluvarti Maria das to Kuchipudi Johnson Jayabrat Reddy nargar 12th ward

6.00

Completed

SCSP

Providing C.C.Drain Opp WTP in 12th ward

6.00

Completed

SCSP

Providing C.C.Drain's at Srinivasa colony in 12th ward

10.00

Completed

SCSP

Providing CC road from Culvert at jaibharat nagar to housing area in 12th ward

72.74

Work order issued, Agreement to be concluded

SCSP

Providing CC road from CH Prasad House to K Johnson House at 12th ward

4.85

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from Balanandam Aided School to Repalle Road at12th ward

5.37

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain, Road  and Culvert from G Nageswara Rao House to S.Sudhakar House 12th ward

8.30

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from B Marthamma House to K Raju Ratnam at 12th ward

3.54

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from Manjula House to Varelu House at 12th ward

1.82

Work order issued, Agreement to be concluded

Total Estimation Cost

148.81

 
Image

Development Works in the 13th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

SFC

Providing WBM Road from Vadranam Raja Rao House to Karra Johnpaul House at 13th ward Mondi Kalavakatta.

3.38

Completed

SFC

Construction of CC Drains from Chebrolu Giri House to Mande Devadasu House at 13th ward

3.02

Completed

GF

Providing C.c Road from Vadranam Sudhakar House to Mandru Yacob House at 13th ward

2.28

Completed

GF

Providing Retaining wall at  Vadimukalla Culvert

1.00

Completed

GF

Construction of CC Drains from Chebrolu Giri House to Mande Devadasu House at 13th ward

2.92

Completed

GF

Repairs School Building at Special Municipal Elementary School Vaddimukkala Road 13th ward

0.43

Completed

SDF

Providing C.C.Drain at 13th ward ward in Ponnur Municipality

1.50

Work to be Started

SCSP

Construction of CC Drains from Katti Srinivasa Rao House Gugilam Seshaya House at Ambedkar Nagar 13th ward

6.00

Completed

SCSP

Construction of CC Drains fromEdu Somaiah House to Rati krind Koteswara Raoat Ambedkar Nagar 13th ward

2.87

Completed

SCSP

Construction of CC Drains from Boleddu Rataiah House to Katti Srinivasa Rao House at Ambedkar Nagar 13th ward

4.30

Completed

SCSP

Construction of CC Drains from Yatati Bhavanarayana House Mandru Adam at Ambedkar Nagar 13th ward

5.85

Completed

SCSP

Construction of CC Drains from Mandru Ankinidu House Rati Krinda Koteswara Rao at Ambedkar Nagar 13th ward

4.20

Completed

SCSP

Construction of CC Drains from  Farre Sanjeva Rao House to Valaparla Adam at Ambedkar Nagar 13th ward

2.20

Completed

SCSP

Construction of CC Drains from Yattati Ravi House to Yattati Kiran House at Ambedkar Nagar 13th ward

2.88

Completed

SCSP

Construction of CC Drains from Gajulaparthi Prasad House to Pondugula Suresh House at Ambedkar Nagar 13th ward

3.20

Completed

SCSP

Providing Drain from Adam House to Alladi Devid House at 13th ward  in  Ponnur Municipality

3.80

Completed

SCSP

Leveling the  Community site at vaddimukkala road at 13th ward

4.80

Completed

SCSP

Leveling of 12th & 13th wards burial grounds

3.20

Completed

SCSP

Protection of Mondi Kaluva from Repalle Road to Vaddimukkala Road in Ponnur Municipality - Package-I

49.99

Completed

SCSP

Protection of Mondi Kaluva from Repalle Road to Vaddimukkala Road in Ponnur Municipality - Package-II

49.98

Completed

SCSP

Construction of C.C Road from Kanneganti Arjuna Rao House to Yathati Seshaiah House at 13th & 14th Ward in Ponnur Municipality.

32.61

Completed

SCSP

Providing CC road from John Paul house to V Rajendra Prasad House 13th ward

7.86

Work order issued, Agreement to be concluded

SCSP

Providing CC Slab Culvert crossing between V. Raju road to Ch. Mariammah road 13th ward

2.22

Work order issued, Agreement to be concluded

SCSP

Construction of C.C.Road and Drain from D Naga Raju House to K Pitchaiah House at 13th ward

3.99

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Ch Mariyamma House to K Arjun House 13th ward

8.10

Work order issued, Agreement to be concluded

SCSP

Widening of CC road from Chrch at  Repalle road to Vattimukkala road 13th ward in  Ponnur Municipality

21.47

Work order issued, Agreement to be concluded

SCSP

Construction of Community Centre at 13th ward Nidubrolu

34.32

Work order issued, Agreement to be concluded

Total Estimation Cost

268.37

 
Image

Development Works in the 14th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing Key Walls and Dust from Mikkili Daniyelu (H) toSudhakar Chruch at14th ward

1.65

Completed

GF

Providing CC Road from Mandru Adam (H) to Pulipaka Arun (H) at DRK Colony at 14th ward

2.74

Completed

GF

Construction of CC Drains at Mosque to Nanapaneni Hari babu House at 14th ward

9.50

Completed

Non-Plan

Ponnur Municipality -   Providing Keywalls and dust various places at 14th  Ward in Ponnur Municipality under  Non plan grant

3.19

Completed

13th Finance

Construction of CC Drains at Ganata Mohan Rao House to Nidubrolu Andhra Bank

9.50

Completed

14th Finance

Construction of CC Drains from Mikkili Dhaniyalu House to Dasari Sushela Rao at Ambedkar Nagar 14th ward in Ponnur Municipality.

9.99

Completed

14th Finance

Providing C.C. Road from K Avvamma House to Prasad House at 14th ward in Ponnur Municipality

3.73

Completed

SDF

Providing C.C.Road from E.Sudhakar House to Masque at 14th ward

5.00

Completed

SDF

Construction of C.C.Drain from yatati Bhavanarayana House to Katti Venkateswara Rao house in 14th ward

2.00

Work to be Started

SDF

Providing C.C.Road at 14th ward ward in Ponnur Municipality

1.50

Work to be Started

SCSP

Construction of CC Drains from Chunduri Naga Prasad house to Suresh house at Ambedkar Nagar 14th ward

5.95

Completed

SCSP

Construction of CC Drains from Avamma House to Valavarla Adam House at Ambedkar Nagar 14th ward

3.15

Completed

SCSP

Construction of CC Drains from Pulipati Nagaiah House to Suresh Houseat Ambedkar Nagar 14th ward

5.70

Completed

SCSP

Providing Drain from M Anil House to T Prasad Hopuse at 14th ward  in  Ponnur Municipality

4.60

Completed

SCSP

Providing Drain from B Rangan Rao House to PBN College Road (Water tank) at 14th ward  in  Ponnur Municipality

3.80

Completed

SCSP

Providing Drain from S Veeraiah House to P Ravi House at 14th ward  in  Ponnur Municipality

4.80

Completed

SCSP

Providing CC road from K Adam House to Yesob House at DRK Colony 14th ward in  Ponnur Municipality

2.00

Completed

SCSP

Providing CC  drain from Chanti (H) to Basheer  (H) in RJV  at 14th ward in  Ponnur Municipality

3.00

Completed

SCSP

Providing CC  drain from Potharaju house to Anandha Rao house in RJV  at 14th ward in  Ponnur Municipality

3.10

Completed

SCSP

Providing CC  drain from Sk Hussain house to Srimanaratana house in RJV  at 14th ward in  Ponnur Municipality

3.10

Completed

SCSP

Providing CC drains from K. Ravamma(H) to K. Haribabu(H) in RJV  at 14th ward in  Ponnur Municipality

3.20

Completed

SCSP

Construction of CC Drain from Ch Naga Prasad House to Nalla Mothu Surya Prakash house  at 14th ward in  Ponnur Municipality

4.80

Completed

SCSP

Providing CC drain from Kalvakollu Narayana House to Sattenpalli Sai Srinivas house at 14th  ward  in  Ponnur Municipality

2.70

Completed

SCSP

Providing CC drain from Vemula Vijay Babu House to K Ramana House at 14th  ward  in  Ponnur Municipality

2.60

Completed

SCSP

Providing CC drain from KU Chanti House to U Ramesh House at 14th  ward  in  Ponnur Municipality

2.70

Completed

SCSP

Providing CC drain from Kancharla Mounika House to Knacharla Ananda Rao House  at 14th  ward  in  Ponnur Municipality

2.68

Completed

SCSP

Providing CC drain from Surabi Poleramma House to Noor Basha Fakir House  at 14th  ward  in  Ponnur Municipality

2.80

Completed

SCSP

Providing CC drain from Parabatina Chitemma House to Kancharla Chini House  at 14th  ward  in  Ponnur Municipality

2.30

Completed

SCSP

Providing Gravel Road from PBN College Road to Suresh House at DRK Colony 14th ward  in  Ponnur Municipality

4.80

Completed

SCSP

Providing Gravel Road from Church Road to Tukiza House at DRC Colony 14th ward  in  Ponnur Municipality

4.70

Completed

SCSP

Providing Gravel Road from Taninga raju (H) to mande kiran (H) at D.R.K colony

1.20

Completed

SCSP

Providing Gravel Road from from Karnati Subbamma (H) To Katari Dhanalakshmi (H) at 14th ward

1.40

Completed

SCSP

Levelling Municipal Site Painam kondaiah (H) to hosanna church backside at14th ward

2.70

Completed

SCSP

Providing Key wall and dust from Katragadda Sridhar (H) to Chandralakha (H)  and Patibandla Shivaiah (H) to Ravula Krishna Rao (H) at 14th ward at 14th ward

2.30

Completed

SCSP

Providing CC drain at DRK colony Main Raod 14th ward

8.46

Work order issued, Agreement to be concluded

SCSP

Providing CC road from IKP Building to Prasad House 14th ward

4.74

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from Prasad House to N Suresh House 14th ward

4.06

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from S.Veeraiah House to P Ravi House at 14th ward

4.04

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain and Road from K Subadra House to P Chittemma House 14th ward

2.62

Work order issued, Agreement to be concluded

SCSP

Providing CC road from D.Devid House to G.Vasantha Rao House at DRK Colony 14th ward

2.25

Work order issued, Agreement to be concluded

SCSP

Providing CC road from K Adam House to Yesob House at DRK Colony 14th ward

1.88

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Ravi House to K Sudaratta 14th ward

2.10

Work order issued, Agreement to be concluded

SCSP

Providing CC road from T Raju House to Kondaiah House at DRK Colony 14th ward

2.18

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Praveen House to G John House at DRK Colony 14th ward

2.64

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Kanakamma house to Y Ravi house at DRK Colony 14th ward

2.56

Work order issued, Agreement to be concluded

SCSP

Providing CC road from M Daneial House to Sudhakar Church at DRK Colony 14th ward

2.25

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from Sk Husain House to S.Sreemanarayana House at 14th ward

2.77

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain and Road from A Sudha Rani House to G Devid House at DRK Colony 14th ward

6.00

Work order issued, Agreement to be concluded

SCSP

Providing CC road from K Rama Chandra House to E Prakasam House at DRK colony 14th ward

2.96

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Subba Reddy House to Maque at DRK Colony 14th ward

2.64

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain from Sridhar House to Ashok House at DRK Colony 14th ward

2.58

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Nageswara Rao Mill to  Subba Reddy House at  14th ward

3.83

Work order issued, Agreement to be concluded

SCSP

Construction of CC Drain and Road from Saidaya House to Ashok House 14th ward

5.37

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Sk Saidabi House to K Siva Parvati House 14th ward

5.85

Work order issued, Agreement to be concluded

SCSP

Providing CC drain from P.Narayana Rao (H) to Venkatrayudu (H)  14th ward

4.24

Work order issued, Agreement to be concluded

SCSP

Providing CC road from K Srinu House to V Adam House 14th ward

6.16

Work order issued, Agreement to be concluded

SCSP

Providing CC road from V Adam House to K Sudhakar House

2.65

Work order issued, Agreement to be concluded

Total Estimation Cost

213.71

 
Image

Development Works in the 15th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-Plan

Providing Key Wall and dust road from ex.CC rpoad to CH. Nakka Raju (H) in Sanjay Nagar Colony at 15th Ward.

3.50

Completed

Non-Plan

Ponnur Municipality -   Providing Keywalls, dust and gravel from Counciler house end of the road and provide gravel shoulders bothsides entire road of Sanjaynagar colony 15th  Ward under  Non plan grant

3.00

Completed

GF

Construction of Compund Wall at SanjayNagar Elementary School at 15th ward in Ponnur Municipality

4.35

Completed

GF

Construction of Compund Wall at Patha Panchayathi Office at 15th Ward in Ponnur Municipality

1.96

Completed

SDF

Construction of C C Drain from Bujangaiah Gari Bazar to Dr. Muraligari (H) at 15th ward

2.00

Completed

SDF

Construction of C.C.Culvert and Key wall dust at Councilar House Road in 15th ward

1.33

Completed

SDF

Providing C.C.Road from Cholla Nukaraju House to Dagumalli Sambrajyam House at 15th ward ward in Ponnur Municipality

1.50

Completed

14th Finance

Construction of Compound wall

5.70

Completed

14th Finance

Providing C.C. Road from Pamulapati Sambasiva Rao House to Pamulapati Sulochanamma House at 15th ward in Ponnur Municipality

5.20

Completed

MPLads

Providing C C Raod from Cholla Nukaraju House to Dagumalli sambrajam House at 15th ward in  Ponnur Municipality

2.00

Work to be Started

SFC

Providing CC drain from Bolisetti Yedikondalu (H) to Mallavarapu Polamma (H), Kondamudi Krishnaiah (H) to Palaparthi Alivelu and Key wall dust from Pamulapati Venkaiah (H) to Pamulapati Ankinudu (H) at 15th ward

9.14

Completed

SFC

Construction of CC Drain from Bandi Jalamma House to Tadesetty Tirupataiah House at 15th ward in Ponnur Municipality.

3.45

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Karri Sambrajam House to Nakka Yesamma House at 15th ward in Ponnur Municipality.

1.72

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Reddy Tulsamma House to Potti Ramudu at 15th ward in Ponnur Municipality.

3.10

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Shaik Chamanbi house to Main road at 15th ward in Ponnur Municipality.

3.10

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Konda Rama Krishna House to Borra Chinmayi House at 15th ward in Ponnur Municipality.

2.60

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Taneeru Sivaiah House to Chakali vari House at 15th ward in Ponnur Municipality.

1.86

Work order issued, Agreement to be concluded

SFC

Providing C C Road from Sangam Dairy Shop to Hari Reddy House at 15th Ward in Ponnur Municipality

7.53

Work order issued, Agreement to be concluded

SFC

Providing C C Road from Nagendramma House to Government Hospital  in Ponnur Municipality

24.80

Work order issued, Agreement to be concluded

Total Estimation Cost

87.84