Development Works in the 16th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing Gravel Road at 16th Ward Kalavakatta Road

5.32

Completed

GF

Ponnur Municipality -Construction of C.C. Drain at Sri Nagar Colony 2nd  lane at 16th ward

6.70

Completed

Non-Plan

Ponnur Municipality -Construction of C.C. Drain at Sri Nagar Colony 2nd  lane at 16th ward under  Non plan grant

7.50

Completed

Plan

Providing Keywalls and dust from Chenupati Kishore house to Venkateswara Nagar Raod 16th  Ward

1.68

Completed

14th Finance

Providing C.C.Drain from Vejalla Hanumantha Rao House to Ch Subba Rao House at 16th ward in Ponnur Munucipality

4.40

Completed

14th Finance

Providing C.C.Drain from LIC Chandra Mohan House to Yoganand House at 16th ward in Ponnur Munucipality

2.81

Work to be strated

14th Finance

Providing C.C.Drain from Netaji Nagar High School to LIC Chandra Mohan House at 16thd ward in Ponnur Munucipality

9.52

Completed

SDF

Providing c.C.road at 16th ward in Ponnur Municipality

1.50

Work to be Started

SDF

Construction of C.C.Drain from K Sree Murthy house to Sri Nagar Colony in 16th ward

2.00

Completed

MPLads

Providing  C C Raod from Near Nagendra swamy putta at 16th ward in  Ponnur Municipality

2.00

Completed

SFC

Construction of CC Drain from Island Center to Potturi Krishna Rao (H) via. Ansar Theator

23.75

Completed

SFC

Providing Keywalls and dust from SK Moulali House to K Srinivasa Rao House at 16th Ward in Ponnur Municipality (under SFC Grant)

4.50

Completed

SFC

Providing CC Drain  from Kelam Bhaaskara Rao House to Dr.Karimulla House 16th ward

4.67

Completed

SFC

Providing CC raod and Drain from Sk Khaja Valli House to Mupparaju Ammeswara Rao   at 16th ward in  Ponnur Municipality

6.92

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Kalyani House to Netaji Nagar Main road   at 16th ward in  Ponnur Municipality

8.98

Work order issued, Agreement to be concluded

Total Estimation Cost

92.25

 
Image

Development Works in the 17th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing C.C Road from  Kotturi Krishna Murthy (H) to Chekka Srinivasa Rao(H) at Nethagi Nagar 3rd line.

17.80

Completed

GF

providing C.C Road from Ankinedu Prasad (H) to Sravan kumar (H) at 17th ward

3.75

Completed

GF

Ponnur Municipality –Dismantling of Existing Buliding at Municipal High School at Netaji Nagar

2.34

Completed

14th Finance

Providing C.C.Drain from Netaji nagar 1st line- Dr.Vegendla Radha Krishna  House to Sukhavasi Subba rao House at 17th ward in Ponnur Munucipality

4.68

Completed

SDF

Providing C.C.Road T Sudhakar House to Sravan Kumar House ward in Ponnur Municipality

1.50

Completed

MPLads

Providing CC raod and Drain from Umineni sivaya House at17th ward in Ponnur Municipality

2.00

Completed

SFC

Construction of C C Drain from Island Center to Potluri Krishna Rao House via AnsarTheator  in Ponnur Municipality

23.75

Completed

SFC

Providing Syphon well at sri Ranaga Puram Channel and C.c.Drain at Nageswara Rao House to Sri Rangapuram Channel at 17th ward

8.45

Work is in Progress

SFC

Construction of C C Road from Kakani Venkateswara Rao House to Netaji Nagar Main Road at 17th Ward in Ponnur Municipality

5.20

Work to be strated

SFC

Providing CC raod and Drain from N Siva Prasad Rao House to Raja Rao Hospital Road  at 17th ward in  Ponnur Municipality

3.27

Work order issued, Agreement to be concluded

SFC

Providing CC raod and Drain from Kavuri Raju House to Kokila Bar Road at 17th ward in  Ponnur Municipality

2.71

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Borireddy Venkateswarlu House to Beside Municipal High School Netaji Nagar at 17th ward in Ponnur Municipality.

1.06

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from K Subramanyam House to Ram bau House at 17th ward in Ponnur Municipality.

0.96

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Dr.Vejandla Radha Krishna House to Kavuri Aruna House at 17th ward in Ponnur Municipality.

3.82

Work order issued, Agreement to be concluded

Total Estimation Cost

81.29

 
Image

Development Works in the 18th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-Plan

Ponnur Municipality - Providing C.C.Roads from Tumala Satyavati (H) to A Koteswara Rao (H) at Sri Ram Nagar 3rd lane in 18th wardunder  Non plan grant

3.47

Completed

Non Plan

Providing C.C.Roads from A Koteswara Rao (H) to GBC Road at Sri Ram Nagar 3rd lane in 18th ward

10.90

Completed

GF

Construction of CC Drains at Beside weigh bridge 18th ward

1.00

Completed

GF

Providing Gravel road from Sk Nagur House to Safrin House and slit removal from Rama Mandiram to Brahmam Gari Temple

0.97

Completed

14th Finance

Providing C.C. Road from GBC Road to water Tank at 18th ward in Ponnur Municipality

16.85

Completed

SDF

Providing Keywalls and dust from Abdula shed to Reddy gari house 18th  Ward in Ponnur Municipality

2.00

Completed

SDF

Providing C.C.Road from KSJ College Opposite road 18th ward

1.50

Completed

MPLads

Providing C C Raod from KSJ College opposite road at18th ward in Ponnur Municipality

2.00

Completed

SFC

Construction of C.C Drain from Marupudi Subbrao (H) to Anna rao Geaust House Road

14.75

Completed

SFC

Providing CC raod from GBC Road to Jasti Venkateswara House at 18th ward

11.20

Completed

SFC

Providing CC raod and Drain from beside Sujja Fuction hall at GBC road 18th ward in  Ponnur Municipality

4.29

Work order issued, Agreement to be concluded

SFC

Providing Keywalls and dust from Venkateswara nagar Main Raod to Jyothi Giri Nilayam (3rd cross road) at 18th   Ward in Ponnur Municipality

1.17

Work order issued, Agreement to be concluded

SFC

Providing Keywalls and dust Beside Brahmamagari temple at 18th   Ward in Ponnur Municipality

2.54

Work order issued, Agreement to be concluded

SFC

Construction of Community Building at 18th Ward in Ponnur Municipality

5.80

Work order issued, Agreement to be concluded

 

Total Estimation Cost

78.44

 
Image

Development Works in the 19th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Reading Room at Vasatiwada 19th ward

1.45

Completed

14th Finance

Construction of Compound wall

6.20

Completed

SDF

Providing C.C.Road at 19th ward in Ponnur Municipality

1.50

Work to be Started

SCSP

Providing Gravel Road from Katta bulliah (H) to culvert in19th ward

4.99

Completed

SCSP

Providing Gravel Road from Katta bulliah (H) to culvert in19th ward

4.99

Completed

SCSP

Providing C.C.Drain from Yerukulawada culvert to Kasukaru Bridge at 19th ward

33.95

Work order issued, Agreement to be concluded

SCSP

Providing CC road from GBC Road Culvert  to  Burrial ground 19th ward

12.96

Work order issued, Agreement to be concluded

SCSP

Providing CC road from Culvert (ST Colony) to Urban Health Centre 19th ward

14.89

Work order issued, Agreement to be concluded

SCSP

Construction of Key walls & dust and Culvert from Urban Health Centre to G Mohan Rao House 19th ward

2.98

Work order issued, Agreement to be concluded

SCSP

Providing CC road from K. Bulliah (H) to ST colony Culvert 19th ward

7.67

Work order issued, Agreement to be concluded

SCSP

Providing CC road from ST colony Culvert to Relly Colony 19th ward

26.78

Work order issued, Agreement to be concluded

SCSP

Construction of Compound wall at S.T Colony (Relly colony) burial ground 19th wards

6.64

Work order issued, Agreement to be concluded

SFC

Construction of C C Drain from American Hospital to Lorry Stand towards GBC Road in Ponnur Municipality

13.55

Work to be Started

SFC

Providing CC raod  from Karanam Gari Bazar at Weavers Colony at 19th ward in  Ponnur Municipality

9.40

Work order issued, Agreement to be concluded

Total Estimation Cost

147.95

 
Image

Development Works in the 20th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Ponnur Municipality – Providing C.C.Road for Approaches at Anuradha Complex, Jandha Chettu, Navarang Tea Stall Point

2.00

Completed

GF

Ponnur Municipality – Repairs to Municipal School at E-seva Building

3.23

Completed

13th Finance

Providing C.C. Drain at Mubarak Nagar

49.99

Work Stopped

14th finance

Providing C.C. Drain at Mubarak Nagar

50.00

Work order issued, Agreement to be concluded

 

SDF

Providing C.C.Road  at 20th ward in Ponnur Municipality

1.50

Work to be started

MPLads

Providing C C Raod  at20th ward in Ponnur Municipality

2.00

Work to be started

SFC

Providing CC Drain  from SPP Road to TB Drain (Beside Ganesh Bhavan) 20th ward

9.96

Completed

SFC

Providing CC Drain  from SPP Road to TB Drain (Beside Ganesh Bhavan) 20th ward in  Ponnur Municipality

2.00

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Best Electranics tp Buran House at 20th ward in Ponnur Municipality.

4.33

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain  at Karam Mill at 20th ward in Ponnur Municipality.

1.72

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain  from S.P.P.Road to Mubarak Nagar at 20th ward in Ponnur Municipality.

4.33

Work order issued, Agreement to be concluded

Total Estimation Cost

131.06

 
Image

Development Works in the 21st ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Repairs of Sri Rajiv Gandhi Municipal Shopping Complex

2.90

Completed

GF

Repairs of Smt Dasari Anuradha Municipal Shopping Complex

1.70

Completed

SFC

Providing CC raod from Mubarak Nagar Main road devalan Khan (H) to Rafi (H) at 21st ward

6.83

Work is in progress

SFC

Providing C C Road from GBC Road to S.P.P Road and S.P.P Road to Mubarak Nagar Masque Main Road  in Ponnur Municipality

23.36

Work order issued, Agreement to be concluded

SDF

Providing C.C.Road at 21st ward in Ponnur Municipality

1.50

Work to be Started

Total Estimation Cost

36.29

 
Image

Development Works in the 22nd ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

SFC

Construction C.C.Road from kasukaru Road to Felo chruch

14.93

Completed

SDF

Providing C.C.Road at 22nd ward in Ponnur Municipality

1.50

Work to be Started

SCSP

Construction of C.C. Road from P Jyothi House to Chundi Venkata Swamy at 22nd ward in  Ponnur Municipality

4.50

Completed

SCSP

Construction of C.C. Road from Yedukondalu House to Akkidas Samson at 22nd ward in  Ponnur Municipality

4.99

Completed

SCSP

Providing CC raod & Culvert from Ch Ram Babu (H) to Y Padma (H) 22nd ward

4.27

Work order issued, Agreement to be concluded

SCSP

Providing CC raod & Drain from Gunna Aleya (H) to B. Koteswara rao (H) 22rd ward

10.56

Work order issued, Agreement to be concluded

SCSP

Providing CC raod & Drain from Vani  (H) to k.Pullaiah (H) 22rd ward

11.33

Work order issued, Agreement to be concluded

SCSP

Providing CC road at P. Dhanamma(H) in 22nd ward

1.74

Work order issued, Agreement to be concluded

Total Estimation Cost

53.82

 
Image

Development Works in the 23rd ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

SDF

Providing C.C.Road at 23rd  ward in Ponnur Municipality

1.50

Work to be Started

SCSP

Providing Drain from Slman Raju House to Master house at 23rd ward  in  Ponnur Municipality

3.10

Completed

SCSP

Providing Drain from Syamala House to S Prasad House at 23rd ward  in  Ponnur Municipality

3.50

Completed

SCSP

Providing Gravel Road from Gera chiranjeevi gari (H) To g satyam gari (H) At 23rd ward

1.20

Completed

SCSP

Leveling of the C . R. C Building at 23rd ward

4.95

Completed

SCSP

Construction of C.C Drain from Yajara Church to Sudarshan House at 23rd ward in Ponnur Municipality

3.80

Completed

SCSP

Construction of C.C Drain from Dayakar House to G.Leela House at 23rd Ward in Ponnur Municipality

3.85

Completed

SCSP

Construction of CC Drains from Churuch to Anjaneya Swamy Temple (Pata Ponnur)-23rd ward

5.30

Work to be Started

SCSP

Providing C.C.Drain from Cristian Burial Ground to Upto Yerukulawada at 23rd ward

56.34

Work order issued, Agreement to be concluded

SCSP

Providing CC drain from R. Babu (church) to LEFI Prardhan mandir  23rd ward

5.91

Work order issued, Agreement to be concluded

SCSP

Providing CC raod & Drain from Mangiah master  (H) to N. Koteswara rao (H) 23rd ward

6.83

Work order issued, Agreement to be concluded

Total Estimation Cost

96.28

 
Image

Development Works in the 24th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

SDF

Providing CC Road from P Prasad House to Bhavana rushi Kalyanamandapam House at 24th ward

3.60

Completed

SDF

Providing CC Road from Ch. Lakshminarayana House to Ch. Yugandhar House at 24th ward

5.60

Completed

SDF

Providing C.C.Road at 24th  ward in Ponnur Municipality

1.50

Completed

SDF

Providing c.c.Road from Koppaka Ranga Rao house to Tadigopula Subba Rao House at 24th ward

3.12

Completed

 

Non-Plan

Ponnur Municipality - Providing C.C.Road & Drain from Kommeneni Sambaiah House to Cherukuri Veraiah at 24th ward under  Non plan grant

3.26

Completed

GF

Repairs to Sri Rama Municipal Elementary School in 24th ward in Ponnur Municipality

1.28

Completed

GF

Ponnur Municipality - Providing C.C.Roads from  Tadikonda Sreeram House to Tadikonda Krishna Murthy House at 24th ward

2.00

Completed

GF

Providing Plastring and Flooring at Hindu Burial Ground at 24th Ward in Ponnur Muninicpality

0.96

Completed

14th finance

Providing C.C. Road from at tadivada Muneswara Rao House at 24th  Ward in Ponnur Municipality

8.57

Completed

14th finance

Constructionof compound wall

7.50

Completed

14th finance

Providing C.C.Drain from Dr. Chitti babu garu Apartment  to Yadlapati Murali Garu house in 24th ward in Ponnur Municipality

8.05

Completed

MP Lads

Construction of Community Hall at Patha Ponnur in Ponnur Municipality

5.00

Work is in Progress

SFC

Providing CC raod from Palakendram to Kasukaru Road and Palakendram to Koppaka Siva Rama Babu house at 24th ward

26.20

Work is in progress

SFC

Providing CC raod and Drain at Kalyana Mandapam front side  at 24th ward  in Ponnur Municipality.

4.10

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from Road widinening at Sai Baba Temple  in  Ponnur Municipality

2.82

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from Sri Kanth House to Adinarayana House  in  Ponnur Municipality

1.91

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain at Uppala subba Rao House at 24th ward  in Ponnur Municipality.

5.93

Work order issued, Agreement to be concluded

Total Estimation Cost

91.40

 
Image

Development Works in the 25th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing W B M Road from Srinivasa Rao (H) to Tajuddin (H) at 25th ward

1.51

Completed

Non-Plan

Ponnur Municipality - Providing C.C.Roads at Polleramma donka at 25th ward under  Non plan grant

4.47

Completed

13th Finance

Construction of C.c.Drain at Bharat Gas Godown

17.10

Completed

GF

Constructiono of NTR Sujala Water Shed at Sri Rama Municipal High school premises

1.68

Completed

GF

Providing tube llights, celing fans and dust at community hall (S.T Colony) 25th ward

0.78

Completed

GF

Ponnur Municipality -   Providing Road & Drain crossing pipes  Itikampadu road  at Kollimarla drain Crossing

2.00

work to be started

GF

Providing C.C.Road over existing C.C.Road at K Venkateswarlu house in 16th ward and Providing C.C. at Gap filling in Intikampadu road in 25th ward

3.22

Completed

GF

Providing Keywalls and dust from Abdula house to municipal site 25th  Ward

3.30

Completed

GF

Providing Earth Filling at Municipal Site at 25th Ward in Ponnur Municipality

2.00

Completed

GF

Providing Earth Filling at Community building at 25th Ward in Ponnur Municipality

2.00

Completed

14th Finance

Providing C.C.Drain from Padmarao house Ravuri Braham House at S.T colony in 25th ward in Ponnur Munucipality

2.75

Completed

14th Finance

Providing C.C.Drain from Bajaz Jeela House to Shaik Baba House in 25th ward in Ponnur Munucipality

3.55

Completed

14th Finance

Providing C.C.Drain from Naeam Jani House (Mosque Back Side)  to Jangam Pitchaiah House in 25th ward in Ponnur Munucipality

3.85

Completed

14th Finance

Providing C.C. Road at Naeam Jani House (Masque Back side) to Jangam Pitchaiah house at 25th ward in Ponnur Municipality

8.00

Completed

SDF

Providing Key wall & Dust from Municipal site in Itikampadu road in 25th ward

2.00

Completed

SDF

Providing C.C.Road at 25th  ward in Ponnur Municipality

1.50

Completed

Mplads

Providing C C Raod  at 25th ward in Ponnur Municipality

2.00

Completed

SFC

Providing CC road  Abdula House to Municipal site at 25th ward in  Ponnur Municipality

10.60

Completed

SFC

Providing CC raod  from Davood house to Itikampadu road at 25th ward in  Ponnur Municipality

8.86

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from Abdula Mesry House to Municipal Siteat 25th ward in  Ponnur Municipality

3.58

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain from Davood House to Patta Ponnur Mangalapalem at 25nd ward in Ponnur Municipality.

9.86

Work order issued, Agreement to be concluded

Total Estimation Cost

94.61

 
Image

Development Works in the 26th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

13th Finance

Providing c.C.Drains at Gajulapalem

28.16

COMPLETED

Non-Plan

Ponnur Municipality - Providing C.C.Roads from  H.T Convent to Prasad house at 26th ward under  Non plan grant

3.20

COMPLETED

GF

Repairs to of Municipal Elementary School at Gajulapallem in 26th ward

1.20

COMPLETED

SDF

Construction of C.C.Road at Rama Mandiram Centre in 26th ward

1.92

COMPLETED

SDF

Providing C.C.Road at 26th  ward in Ponnur Municipality

1.50

Work to be Started

MPLads

Providing C C Raod  at 26th ward in Ponnur Municipality

2.00

Work to be Started

SFC

Providing CC Drain  from Sivaiah rice Mill to SP Charan (H) 26th ward

24.41

The Work was taken up by the R& B Department

SFC

Providing C C Road from Janpadu Siva Prasad House to Kalvagunta Sambaiah House at 26th Ward in Ponnur Municipality

4.50

COMPLETED

SFC

Providing CC raod and Drain from Jangam Kondaiah House to Madhu House at 26th ward  in Ponnur Municipality.

20.77

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain Kedari Subba Rao House to Murthy Mahal at  at 26th ward  in Ponnur Municipality.

2.30

Work order issued, Agreement to be concluded

Total Estimation Cost

89.96

 
Image

Development Works in the 27th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing WBM Road from Itikampadu Cross Roads ( Near Idga)

5.41

Completed

GF

Ponnur Municipality – Repairs to Municipal Reading Room at27th ward

2.70

Completed

13th FC

Construction of CC Drains at PatanLal Jan House to Shaik Mustak at Tukaram Rice Mill

10.00

Completed

SDF

Providing CC Road from Opp. Noor Mosque to Mohammad House

4.10

Completed

SDF

Providing C.C.Road at 27th ward in Ponnur Municipality

1.50

Work to be Started

MPLads

Providing C C Raod  at 27th ward in Ponnur Municipality

2.00

Work to be Started

SFC

Providing Gravel Road from Nazir teacher House to Sk.Rahamahtulla House at 27th Ward in Ponnur Municiaplity

4.20

Completed

SFC

Providing CC drain from Existing drain at beside tukaram Rice Mill to  Itikampadu road   at 27th ward

6.74

Work is in Progress

SFC

Construction of CC Drain Itikam Padu road Putta Rich Mill to Edga at 27th ward  in Ponnur Municipality.

11.08

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain Markas Masque to Matla Mudi Mastan House at 27th ward  in Ponnur Municipality.

5.39

Work order issued, Agreement to be concluded

Total Estimation Cost

53.12

 
Image

Development Works in the 28th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-Plan

Ponnur Municipality -  Providing C.C.Road & Drain from Surya Prakash Shop to Chand Basha Housel at 28th ward under  Non plan grant

3.18

Completed

Non Plan

Providing C.C. Road from Gouse house to Taj house 28th  Ward

11.07

Completed

14th Finace

Providing C.C. Road from Moula (H) to Barkar Jewllers at 28th  Ward in Ponnur Municipality

12.25

Completed

14th Finace

Providing C.C. Drain from Moula (H) to Barkar Jewllers at 28th  Ward in Ponnur Municipality

4.40

Work to be started

GF

Providing Arch at Itikampadu Road in Ponnur Municipality

1.90

Completed

SDF

Construction of C.C.Drain from Sharaf Bazar Culvert to Opp Mosque in 28th ward

3.00

Completed

SDF

Providing C.C.Road at 28th ward in Ponnur Municipality

1.50

Work to be Started

MPLads

Providing C C Raod  at 28th ward in Ponnur Municipality

2.00

Work to be Started

SFC

Providing CC raod & Drain from Gurram Venkateswara Rao (H) to Gademsetty Venkateswara Rao (H) and Ragupathi Master (H) to Srinivasa textiles at 28th ward

14.19

Work is in Progress

SFC

Providing CC raod and Drain from MSR Building to Balaji House (Dhaba Badi)  at 28th ward  in Ponnur Municipality.

11.26

Work order issued, Agreement to be concluded

SFC

Construction of CC Drain Basweswara Rao Iron Shop to MSR Buildingat 28th ward  in Ponnur Municipality.

4.15

Work order issued, Agreement to be concluded

Total Estimation Cost

68.90

 
Image

Development Works in the 29th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

Non-PG

Providing C.C.Road from Ex.C.Croad to Yarasani Bavaiah(H) at 29th Ward

1.56

Completed

 

13th

Construction of CC Drain from Nanni Manna (H) to Subani (H) at Beside of Tukarm Rice Mill 29th ward

9.42

Completed

MPLads

Providing C C Raod  at 29th ward in Ponnur Municipality

2.00

Work to be Started

SDF

Providing C.C.Road at 29th  ward in Ponnur Municipality

1.50

Work to be Started

SFC

Providing CC Road From Chinna Rama Mandiram to Sivaiah House (Kappalagunta)

12.85

completed

SFC

Providing CC raod from Kurshid Teacher (H) to Basha (Ladies Tailor) house, c.C.road from Haji Babu Saheb House to Baji (Miller) House, Sk Subhani (Army) House to Mastanvalli House and Providing Key walls & dust RK School to Jani site  at 29th ward

21.74

Work to be Started

SFC

Providing CC raod and Drain from Abdula Teacher house to Husain House at 29th ward  in Ponnur Municipality.

7.34

Work order issued, Agreement to be concluded

SFC

Providing CC raod  from  Abdula Raj House to Subhani Shop at 27th ward in  Ponnur Municipality

5.03

Work order issued, Agreement to be concluded

Total Estimation Cost

61.44

 
Image

Development Works in the 30th ward as on 20.08.2018

Type of
Grant

Name of the work

Estimated Amount

Stage of work

GF

Providing C.C.Roads fromVadranam Koteswara Rao House to Sree Rama Murthy house  at 30th ward

9.00

Completed

GF

Providing C.C.Roads from Vadranam Koteswara Rao House to Rama Mandiram road  at 30th ward

9.89

Completed

GF

Construction of C.C.Culvert at Meghanath house 30st ward

0.82

Completed

GF

Construction of C.C.Culvert at Narayana rao house 30tt ward

0.48

Completed

14th Finance

Construction of CC Drains from YSR Murthy House (H) to Rama Mandiram telagapalem  at 30th ward in Ponnur Municipality

5.56

Completed

14th Finance

Construction of CC Drains on both sides & a Culvert from Kattula Sivaiah(H) to Yarasani Sriram Murthy (H) at 30th ward in Ponnur Municipality

6.20

Completed

14th Finance

Providing C.C. Road from Kattula Sivaiah(H) to Yarasani Sriram Murthy (H) at 30th  Ward in Ponnur Municipality

11.25

Completed

SDF

Providing C.C.Road from Thota Sambaiah House to Katula Rataiah House  in 30th ward

2.70

Completed

SDF

Providing C.C.Road at 30th ward in Ponnur Municipality

1.50

Work to be Started

SFC

Providing CC raod from BSNL Venkata subramanyam (H) to M Rattaiah (H) and Adapa Srinu (H) to Ring Road at 30th ward

17.89

Work is in progress

SFC

Providing CC raod  from Adapa Srinu House to P Yedukondalu Appartment at 30th ward  in Ponnur Municipality.

21.78

Work order issued, Agreement to be concluded

Total Estimation Cost

87.07